Conceptual Design Study of DOME: A Facility for Design and Optimisation of Moon/Mars Explorers
- Client: ESA, ESTEC Contract No. 19642/05/NL/CP
- Period: Conceptual study (February - July 2006), Detailed design (November 2007 - May 2008)
- Prime Contractor: 4CON Ltd.
- Consultants: Ove Arup, Davis Langdon Associates and Altus Associates

Such a planetary surface emulation facility, now referred to as DOME (for A Facility for Design and Optimisation of Moon/Mars Explorers) will be an important ESA project, purpose-designed to contain and conduct specialized research on and simulations of lander and rover surface operations at Mars and other locations. No such research facility with theses capabilities exists elsewhere at present. It has the potential to be a project of international significance, providing not only an effective research and development tool but a window for public and educational observation of the cutting edge of space exploration. A conceptual design study was carried out by a 4CON-led team in the period February - July 2006. The other team members were Ove Arup, Davis Langdon Associates and Altus Associates. The study work was divided into three main elements:
• Definition of the detailed system requirements of the DOME;
• Design the DOME to fulfill the requirements and cost;
• Define planning and costing for an incremental development of the DOME.
The second phase of the DOME project, to carry out the design work and the production of an Engineering Drawing and Data Package to support contractor tendering for the construction of the DOME, commenced in November 2007 with the same team and was completed in May 2008.